Project outcomes
The RIBA Plan of Work 2013 defined project outcomes as:
'The desired outcomes for the project (for example, in the case of a hospital this might be a reduction in recovery times). The outcomes may include operational aspects and a mixture of subjective and objective criteria.'
The RIBA Plan of Work 2020 defines project outcomes as:
'The desired outcomes for the project, including Sustainability Outcomes, set out in Stage 0 (Strategic definition) to inform the Client Requirements. For a hospital, a reduction in recovery times might be a key Project Outcome. The outcomes may include operational aspects, as well as a mixture of subjective and objective criteria, and will influence the preparation of the Project Brief.'
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.